CASE STUDY
RECOVERY AFTER FAILURE

How we managed a 100% rejection of a full truckload for a top designer brand – at zero cost to the client.
THE CHALLENGE
Rejected shipment on delivery
THE CONTEXT
A solid pine coffee table was developed, sampled, and fully approved by the client's lead designer.
Following production, the first batch passed TRA-CON's final quality inspection and was released for delivery.
THE ISSUE
Upon arrival at the client's warehouse, the lead designer rejected a significant portion of the shipment.
While both parties had previously agreed that natural color variations are inherent to stained solid pine, the variation in this batch exceeded the designer's acceptable tolerance threshold.
| PRODUCT | Solid pine coffee table |
| ISSUE | Too transparent stain exceeded designer's tolerance |
| REJECTED LOT | No. 1 |
| APPROVED LOT | No. 2 |
| RESOLUTION | Fully restored within a few weeks – zero cost to client |

The two colour swatches above show the actual colour samples from this project – the rejected lot (No. 1) and the approved replacement (No. 2) have a stain that still shows the wood grain, but is less transparent.
THE DIFFERENCE
What most suppliers do
- Dispute who is responsible
- Negotiate partial refunds
- Return logistics handled by the client
- Months of back-and-forth
What TRA-CON does
- Full truckload returned - our freight
- Colour reinspection with factory
- Every unit assessed individually
- Repaired within a few weeks
THE RESPONSE
Instead of negotiating or splitting costs, TRA-CON absorbed 100% of the risk.
We recalled the entire shipment at our own expense, refusing to let the client carry the burden of a manufacturing "grey area." We did not offer a discount on the next order; we provided a solution for the current one.
01
Product approved
Sample signed off by client designer
02
QC released
TRA-CON inspects and clears batch
03
Issue found
Colour deviation exceeds tolerance
04
Full return
Entire truck back – TRA-CON pays
05
Colour repair
Factory and TRA-CON complete repairs on all units
Our team went directly to the factory to oversee the re-inspection of every unit.
Within weeks, every non-conforming piece was repaired and redelivered. Such accountability has allowed that same coffee table to maintain its market success since 2018.
THE RESULTS
7+
YEARS
Ongoing partnership and continued market success.
100%
RETURNED
The entire truckload. At TRA-CON's expense.
0€
COST
No cost incurred for the resolution.



