CASE STUDY
TRANSITION FROM FAR EAST TO EUROPE


Why a 15% price increase led to record sales.

By moving production from China to Europe, TRA-CON reduced lead times to just 6 weeks and fixed ongoing quality issues.

 

THE INITIAL STATE

The China Dilemma


Our client initially outsourced production to China to minimize labor costs. However, as the brand scaled, the following friction points emerged:

  • Inventory bloat. High Minimum Order Volumes (MOQs) forced the client to hold 6 months of stock, tying up significant working capital.

  • Quality inconsistency. The production factory in China had a technology-driven setup, but it still required rigorous oversight at the factory. The lack of proactive quality control from the customer led to quality inconsistencies and insufficient attention to detail.

  • The "Slow" chain. A 17-week lead time meant the brand could not react to seasonal demand spikes, leading to frequent stock-outs.

  • Financial friction. 100% upfront payment terms shifted all operational risk onto the brand.

 

THE COMPARISON

Trading Price for Performance


By moving production to TRA-CON, the client traded "cheap manufacturing" for "efficient cooperation."

[Swipe table right-to-left]
Metric Far East Production TRA-CON (Europe) Strategic Impact
Unit Price €100 €112 – €115 Slightly higher COGS
Lead Time 17-weeks 42 – 56 Days 60% faster response
MOQ 500 Units Flexible / Batch Freed up warehouse capital, small projects
Material Quality Variable Oak Selected A-Grade Near-zero return rate
Shipping Risk High (Sea Freight) Low (Direct trucking) Predictable launch dates

 

The Result

The sales team reported an immediate increase in sell-through rates.

Customers perceived the upgraded quality as a premium feature, justifying the retail price and protecting the brand's reputation.

 

TECHNICAL CAPABILITIES

Why it Works at TRA-CON


We specialize in bridging the gap between high-volume manufacturing and quality craftsmanship.

  • Material integrity. We utilize advanced kiln-drying processes calibrated specifically for the European climate to prevent warping, and we select the most suitable materials so that their physical and chemical structural properties ensure reliable performance throughout the product's intended service life.

  • Prototyping agility. We move from technical drawing to a physical, high-finish sample in weeks, not months.

  • Modern sustainability. 100% FSC-certified raw material and transparent labor practices, ensuring your brand is fully compliant with 2026 EUDR requirements.

 

CONTACTS

Let's discuss the most efficient way to bring your furniture ideas to market.


Contact our furniture developer for a 20-minute cost-efficiency audit.

We will review your current production specs and provide a realistic total landed cost comparison for European manufacturing.

 

Agne Dauksyte

 

Contact our furniture developer, Agnė:

 

Call +370 699 93401

CallThis email address is being protected from spambots. You need JavaScript enabled to view it.

Call LinkedIn